Resources
Sleeper Resources Table
| Material |
Cut-off Au g/t |
MEASURED AND INDICATED |
| Tonnes |
Au g/T |
Ag g/T |
Au Oz |
Ag Oz |
| Oxide |
0.20 |
42,789,940 |
0.37 |
4.20 |
511,872 |
5,781,121 |
| Sulfide |
0.25 |
129,973,513 |
0.51 |
4.68 |
2,113,527 |
19,556,454 |
| Total |
172,763,453 |
0.47 |
4.56 |
2,625,399 |
25,337,575 |
Sleeper Resources Table
| Material |
Cut-off Au g/t |
INFERRED |
| Tonnes |
Au g/T |
Ag g/T |
Au Oz |
Ag Oz |
| Alluvial |
0.20 |
151,675 |
2.03 |
- |
9,890 |
- |
| Oxide |
0.20 |
13,191,635 |
0.32 |
3.42 |
136,145 |
1,450,516 |
| Sulfide |
0.25 |
68,410,857 |
0.44 |
3.07 |
974,376 |
6,752,446 |
| Total |
81,754,167 |
0.43 |
3.12 |
1,120,410 |
8,202,962 |
Source of in-ground 43-101 compliant resource estimate prepared by SRK Consulting, dated September 13, 2011
Above Ground Inferred Resource in Heap Leach Pad Stockpile and Mill Tailings
| Area |
Tonnes |
Avg. Grade Au (oz/t) (g/t) |
Au (oz.) Au Remaining |
Avg. Grade Ag (oz/t) (g/t) |
Ag (oz.) Ag Remaining |
| Total Heap Leach Pad and Stockpile |
44,322,122 |
0.01 |
0.41 |
583,254 |
0.03 |
0.88 |
1,249,983 |
| Mill Tailing |
5,987,481 |
0.02 |
0.68 |
130,166 |
0.22 |
7.67 |
1,476,748 |
| Total |
50,309,603 |
0.01 |
0.44 |
713,920 |
0.05 |
1.69 |
2,726,731 |
Source of above ground 43-101 compliant resource estimate